The structural dimensions and scale development of contract flexibility based on the whole process risk sharing perspective
CSTR:
Author:
Clc Number:

C93;F294;TU723.1

  • Article
  • | |
  • Metrics
  • |
  • Reference [40]
  • |
  • Related [20]
  • | | |
  • Comments
    Abstract:

    Contract flexibility and its analysis has been used in the construction project contract management widely. However, the existing research results have not agreed on the connotation and dimension of contract flexibility, which leads to insufficient empirical studies on project performance due to contract flexibility in construction project. Based on the whole process risk sharing perspective, this study determines the scale of contract flexibility with quantitative methods. Research shows that the contract flexibility can be divided into 3 dimensions: Price Flexibility, Control-right Flexibility and Renegotiation Flexibility. Among them, Price Flexibility is the contract terms corresponding to the initial risk sharing; Control-right Flexibility can transfer the control-right according to the environment corresponding to the risk re-sharing process; Renegotiation Flexibility is the re-contract to deal with the risk re-sharing in the contracting process. The results provide a complete analytical framework for the contract flexibility, and lay a theoretical foundation for the empirical research of the contract flexibility on the contractor's performance behavior.

    Reference
    [1] BRADY T,DAVIES A,NIGHTINGALE P.Dealing with uncertainty in complex projects:Revisiting Klein and Meckling[J].International Journal of Managing Projects in Business,2012,5(4):718-736.
    [2] ERIKSSON P E,LARSSON J,PESÄMAA O.Managing complex projects in the infrastructure sector-A structural equation model for flexibility-focused project management[J].International Journal of Project Management,2017,35(8):1512-1523.
    [3] HARRIS A,GIUNIPERO L C,HULT G T M.Impact of organizational and contract flexibility on outsourcing contracts[J].Industrial Marketing Management,1998,27(5):373-384.
    [4] 刘茂松,陈柏福.论柔性契约与垄断结构企业模式[J].中国工业经济,2006(5):79-86.
    [5] 杜亚灵,李会玲,闫鹏,等.初始信任、柔性合同和工程项目管理绩效:一个中介传导模型的实证分析[J].管理评论,2015,27(7):187-198.
    [6] MCCOMB S A,GREEN S G,DALE COMPTON W.Team flexibility's relationship to staffing and performance in complex projects:An empirical analysis[J].Journal of Engineering and Technology Management,2007,24(4):293-313.
    [7] 娄黎星.项目合同柔性:概念、前因及影响结果[J].项目管理技术,2016,14(3):7-12.
    [8] 石岿然,王冀宁,许景.供应链买方信任的前因及信任对合约修改弹性的影响[J].系统工程理论与实践,2014,34(6):1431-1442.
    [9] SONG H Y,ZHU F W,KLAKEGG O J,et al.Relationship between contractual flexibility and contractor's cooperative behavior:The mediating effect of justice perception[J].International Journal of Managing Projects in Business,2018,11(2):382-405.
    [10] WU G D,ZHAO X B,ZUO J,et al.Effects of contractual flexibility on conflict and project success in megaprojects[J].International Journal of Conflict Management,2017,29(2):253-278.
    [11] SUSARLA A.Contractual flexibility,rent seeking,and renegotiation design:an empirical analysis of information technology outsourcing contracts[J].Management Science,2012,58(7):1388-1407.
    [12] DONG F,CHIARA N.Improving economic efficiency of public-private partnerships for infrastructure development by contractual flexibility analysis in a highly uncertain context[J].The Journal of Structured Finance,2010,16(1):87-99.
    [13] CRUZ C O,MARQUES R C.Flexible contracts to cope with uncertainty in public-private partnerships[J].International Journal of Project Management,2013,31(3):473-483.
    [14] KUJALA J,NYSTÉN-HAARALA S,NUOTTILA J.Flexible contracting in project business[J].International Journal of Managing Projects in Business,2015,8(1):92-106.
    [15] 杜亚灵,尹贻林.不完全契约视角下的工程项目风险分担框架研究[J].重庆大学学报(社会科学版),2012,18(1):65-70.
    [16] 胡乐明,刘刚.新制度经济学[M].北京:中国经济出版社,2009.
    [17] MACAULAY S.商业中的非合同关系:一个初步的研究[J].冉井富,译.北大法律评论,2005,7(1):75-91.
    [18] NYSTÉN-HAARALA S,LEE N,LEHTO J.Flexibility in contract terms and contracting processes[J].International Journal of Managing Projects in Business,2010,3(3):462-478.
    [19] TAN Z J,YANG H.Flexible build-operate-transfer contracts for road franchising under demand uncertainty[J].Transportation Research Part B:Methodological,2012,46(10):1419-1439.
    [20] SHAN L,GARVIN M J,KUMAR R.Collar options to manage revenue risks in real toll public-private partnership transportation projects[J].Construction Management and Economics,2010,28(10):1057-1069.
    [21] 柯洪,刘秀娜.工程合同柔性的本质及不同范本下的条款比较[J].工程管理学报,2014,28(5):32-36.
    [22] LEVIN J,TADELIS S.Contracting for government services:Theory and evidence from us cities[J].The Journal of Industrial Economics,2010,58(3):507-541.
    [23] TADELIS S.Public procurement design:Lessons from the private sector[J].International Journal of Industrial Organization,2012,30(3):297-302.
    [24] ATHIAS L,SAUSSIER S.Contractual flexibility or rigidity for public private partnerships? Theory and evidence from infrastructure concession contracts[J].SSRN Electronic Journal, 2007. https://doi.org/10.2139/ssrn.828944.
    [25] GOTTARDI P,TALLON J M,GHIRARDATO P.Flexible contracts[J].Games and Economic Behavior,2017,103:145-167.
    [26] HART O,MOORE J.Contracts as reference points[J].Quarterly Journal of Economics,2008,123(1):1-48.
    [27] HASSELGREN B,MAKOVSEK D,PERKINS S.Public private partnerships for transport infrastructure; Renegotiations, how to approach them and economic outcomes[C]//International Transport Forum Discussion Papers.OECD Publishing,2014.
    [28] 慕银平,刘利明.价格柔性合同下的原材料采购策略及风险分析[J].中国管理科学,2015,23(3):108-117.
    [29] 李真,孟庆峰,盛昭瀚.考虑公平关切的工期优化收益共享谈判[J].系统工程理论与实践,2013,33(1):82-91.
    [30] WU D J,DING M,HITT L M.IT implementation contract design:Analytical and experimental investigation of IT value, learning, and contract structure[J].Information Systems Research,2013,24(3):787-801.
    [31] VON BRANCONI C,LOCH C H.Contracting for major projects:Eight business levers for top management[J].International Journal of Project Management,2004,22(2):119-130.
    [32] TURNER J R,MVLLER R.On the nature of the project as a temporary organization[J].International Journal of Project Management,2003,21(1):1-8.
    [33] 刘世定.嵌入性与关系合同[J].社会学研究,1999,14(4):77-90.
    [34] 原蓉蓉.英美法中的合同受挫制度研究[D].济南:山东大学,2013.
    [35] 袁静,毛蕴诗.产业链纵向交易的契约治理与关系治理的实证研究[J].学术研究,2011(3):59-67.
    [36] GUASCH J L,BENITEZ D,PORTABALES I,et al.The renegotiation of PPP contracts:An overview of its recent evolution in Latin America[C]//International Transport Forum Discussion Papers.OECD Publishing,2014.
    [37] WEBER L,MAYER K J.Designing effective contracts:Exploring the influence of framing and expectations[J].Academy of Management Review,2011,36(1):53-75.
    [38] SAUSSIER S.Transaction costs and contractual incompleteness:The case of Électricité de France[J].Journal of Economic Behavior & Organization,2000,42(2):189-206.
    [39] KOSNIK L R.Determinants of contract completeness:An environmental regulatory application[J].International Review of Law and Economics,2014,37:198-208.
    [40] 尹贻林,王垚.合同柔性与项目管理绩效改善实证研究:信任的影响[J].管理评论,2015,27(9):151-162.
    Cited by
    Comments
    Comments
    分享到微博
    Submit
Get Citation

严玲,王帅,严敏.全过程风险分担视角下合同柔性的结构维度与量表开发[J].重庆大学学报社会科学版,2021,27(2):94~108

Copy
Share
Article Metrics
  • Abstract:732
  • PDF: 1615
  • HTML: 1343
  • Cited by: 0
History
  • Revised:May 10,2019
  • Online: March 13,2021
Article QR Code