In this Paper,multistoryed buildings of brick and RC floor slab construction are put up on frame beam of 12. 6 m partially prestressed concrete.A test and analysis is carried out on site.It provides a new scheme for multisto-reyed and highrise buildings with beam of transitive force and transfer floor.
参考文献
相似文献
引证文献
引用本文
邓朝荣,牛绍仁.部分预应力混凝土墙梁的研究[J].土木与环境工程学报(中英文),1989,11(4). Deng Chaorong Niu Shaoren. RESEARCH ON WALL BEAM OF PARTIALLY PRESTRESSED CONCRETE[J]. JOURNAL OF CIVIL AND ENVIRONMENTAL ENGINEERING,1989,11(4).10.11835/j. issn.1674-4764.1989.04.008