泉州刺桐大桥主桥墩及桥台施工技术
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

U443.22

基金项目:


Construction Technology for the Main Bridge Pier of Citong Bridge in Quanzhou City
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    泉州刺桐大桥位于入海口河段,最大湖差达4m,地质情况也比较复杂,本文比较详细地介绍了泉州刺桐大桥墩桩基和承台施工技术,包括施工程序、施工工艺、施工主要技术参数选取、事故处理等。可供类似工程 参考。

    Abstract:

    The Citong Bridge is located in the river estuary section with 4 meter tide range and mixed geological structure. In this paper, the technique for construction of the main bridge pier was presented in detail, which consists of the construction process, technological requirements, main construction parameters and amendment on defects. It is of great value for reference to the similar works.

    参考文献
    相似文献
    引证文献
引用本文

许四发 贝沆.泉州刺桐大桥主桥墩及桥台施工技术[J].土木与环境工程学报(中英文),2001,23(5):71-75. XU Si fa, BEI Hang . Construction Technology for the Main Bridge Pier of Citong Bridge in Quanzhou City[J]. JOURNAL OF CIVIL AND ENVIRONMENTAL ENGINEERING,2001,23(5):71-75.10.11835/j. issn.1674-4764.2001.05.015

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:2001-08-30
  • 录用日期:
  • 在线发布日期:
  • 出版日期:
文章二维码