江阴长江大桥B标工程施工总结
CSTR:
中图分类号:

U445.1


Construction Technology for Bid Construction Part B of Yangtze River Bridge in Jiangyin City
  • 摘要
  • | |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献 [1]
  • |
  • 引证文献
  • | |
  • 文章评论
    摘要:

    详细介绍了中国第一跨度的江阴长江大桥B标施工中采用的先进施工工艺和管理措施,如索塔施工三维坐标法测量,人工小药量挖孔桩,下塔柱翻横施工,大体积混凝土浇注温度控制,塔柱斜爬模施工等,可供大型桥梁施工时参考。

    Abstract:

    In this paper, the advanced construction technology and site management applied in bid construction part B of Yangtze River bridge in Jiangyin was presented in detail. This bridge is the largest span bridge in China, where the advanced technology applied is: 3-d coordinate control surveying in bridge tower, small powder for artificial pile, over-form and climb form in construction of tower column, temperature control for casting mass concrete. It is of great value for reference to large bridge building.

    参考文献
    引证文献
    引证文献 [0]
    [1]苏永会,胡玉龙,隆良军.外海桥梁施工新技术[J].重庆建筑大学学报,2003,25(1):123-128.
引用本文

董荧.江阴长江大桥B标工程施工总结[J].土木与环境工程学报(中英文),2001,23(5):85-90129. DONG Ying. Construction Technology for Bid Construction Part B of Yangtze River Bridge in Jiangyin City[J]. JOURNAL OF CIVIL AND ENVIRONMENTAL ENGINEERING,2001,23(5):85-90129.10.11835/j. issn.1674-4764.2001.05.018

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
文章二维码