[关键词]
[摘要]
传统的电源规划投资模型的优化目标是投资费用的最小化,在现代电力企业的决策中有其局限性。本文改进了传统的电源规划投资模型,建立了在未来不确定风险下,基于期望净现值最大化的电力投资模型,并在此基础上讨论了等待价值的计算方法。
[Key word]
[Abstract]
In this paper, traditional investment model for expansion planning of electric generating system is modified, the investment model for expansion planning of electric generating system under uncertainty is modeled and the method of calculating option value of waiting is discussed.
[中图分类号]
F426.61
[基金项目]