工程量清单计价模式下的无标底招标研究
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

TU723.2

基金项目:


On the Non-price Bottom Bidding System under the Mode of Valuation with Bill Quality of Construction Works
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    推行工程量清单计价模式下的无标底招标是我国工程招投标体制改革发展的方向和趋势。首先介绍了推行工程量清单计价模式下无标底招标的意义,然后分析了工程量清单无标底招标的内容和程序,其中重点阐述了工程量清单无标底招标的编制、无标底评标、定标等内容。从资格预审、工程担保以及预控机制等方面探讨了招标人的风险规避和风险管理。

    Abstract:

    It is the direction of the project bidding system reform to apply the non-price bottom bidding system under the mode of valuation with bill quality of construction works in China. In this paper, the significance of implementing the non-price bottom bidding system is analyzed and emphasis is put on the workout of the non-price bottom bidding, valuation and so on. The risk prevention and risk management are studied on the side of tenderee from the qualification examination, engineering guarantee, defending system and so on.

    参考文献
    相似文献
    引证文献
引用本文

陈国龙,顾红春,张友志.工程量清单计价模式下的无标底招标研究[J].土木与环境工程学报(中英文),2004,26(2):116-120. CHEN Guo-long~,GU Hong-chun~,ZHANG You-zhi~. On the Non-price Bottom Bidding System under the Mode of Valuation with Bill Quality of Construction Works[J]. JOURNAL OF CIVIL AND ENVIRONMENTAL ENGINEERING,2004,26(2):116-120.10.11835/j. issn.1674-4764.2004.02.026

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:2003-12-09
  • 录用日期:
  • 在线发布日期:
  • 出版日期:
文章二维码