陆绍凯 武振业.固定资源约束下的网络计划进度优化方法研究[J].土木与环境工程学报(中英文),2005,27(4):88-92. Liu ShaoKai;Wu ZheYe. Study on Approach to Optimize Network Planning Schedule for Fixed Resources Constraint[J]. JOURNAL OF CIVIL AND ENVIRONMENTAL ENGINEERING,2005,27(4):88-92.10.11835/j. issn.1674-4764.2005.04.021