    摘要:

    特大断面公路隧道由于跨度特大和扁平,加上施工期间诸多工序的相互影响、围岩的多次扰动等诸多因素,其受力条件极为复杂,在施工过程中,围岩极易发生失稳乃至坍塌。本文利用“公路隧道结构与围岩综合实验系统(CTSSSRH)”,对特大断面隧道在不同施工方法下的施工动态过程进行了物理模拟,研究了特大断面隧道围岩位移、变形等发展规律,提出了特大断面隧道合理的施工方法。

    Abstract:

    For the super-large section tunnel due to its super large span and flatness,together with the effect of various processes and excitation of surrounding rock during construction,the mechanical behavior of super-large section tunnel is quite complicated.Making use of the "CTSSSRH",the physical analogue for simulating the construction dynamic process of super-large section tunnel in different construction methods is experimented.The rule of surrounding rock displacement and strain development is studied and the reasonable construction method is put forward.

    参考文献
    相似文献
    引证文献
引用本文

吴梦军,黄伦海,刘新荣.特大断面隧道施工方法试验研究[J].土木与环境工程学报(中英文),2005,27(5):57-60. WU Meng-jun~,HUANG Lun-hai~,LIU Xin-rong~. Experimental Study on Construction Method of Super-Large Section Tunnel[J]. JOURNAL OF CIVIL AND ENVIRONMENTAL ENGINEERING,2005,27(5):57-60.10.11835/j. issn.1674-4764.2005.05.014

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:2005-06-20
  • 录用日期:
  • 在线发布日期:
  • 出版日期:
文章二维码