计价规范中措施项目组成分析
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

TU723.3

基金项目:


Analysis of Measurement Items Composition under Bills Pricing Mode
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    结合GB50500-2003的实施以及“建标[2003]206号文”的发布,通过对招投标过程中施工单位的报价内涵的分析,对工程建设过程中的措施项目内容进行了相关的阐述;结合工程结算过程中措施费用部分存在的问题,提出了结合措施项目的特点,进行分类管理的方法,并在此基础上提出了在招投标过程中措施费项目的合理报价方式。

    Abstract:

    This paper analyzes contractor's pricing connotation during bidding period with the implementation of National Standard GB50500-2003 and publish of document JB \206,expatiates the contents of measurements during construction period.Considering the problems derived from expenses of measurements during accounts settlement stage,a classified management method according to the characteristics of these measurements is put forward,and one step further,the rational pricing method of measurement items during the bidding period is suggested.

    参考文献
    相似文献
    引证文献
引用本文

王群,吴刚.计价规范中措施项目组成分析[J].土木与环境工程学报(中英文),2005,27(5):134-136. WANG Qun, WU Gang. Analysis of Measurement Items Composition under Bills Pricing Mode[J]. JOURNAL OF CIVIL AND ENVIRONMENTAL ENGINEERING,2005,27(5):134-136.10.11835/j. issn.1674-4764.2005.05.030

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:2005-04-15
  • 录用日期:
  • 在线发布日期:
  • 出版日期:
文章二维码