Analysis of Risk Factors of Project Cost Base on the Monte-Carlo Simulation
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    将工程造价风险管理理论、技术与概率分析、数理统计、计算机技术等紧密结合,立足于主动控制原理,运用蒙特卡罗模拟及水晶球(Crystal Ball)软件,分析具体工程项目造价的风险水平,检验模型与具体实际相结合时发挥的实效性,提出规避造价风险的措施和方法,为建设工程项目造价管理模式提供决策参考,提高造价管理的效率和精度。

    Abstract:

    This paper combined the method of probability,mathematical statistics,and technology of computer with theory of Project cost risk management,based on the theory of initiative control and took the Crystal Ball as an assistant tool to analyze the risk of cost management in a certain project,verify the actual effect of the model when it is used to the practice,give some suggestions to evade risk in a certain degree and mend the existent decision model to improve the efficiency and precision of analysis of cost management risk.

    参考文献
    相似文献
    引证文献
引用本文

孙海虹,叶晓甦.基于蒙特卡罗模拟技术的工程造价风险因素分析[J].土木与环境工程学报(中英文),2005,27(6):121-126. SUN Hai-hong, YE Xiao-shu. Analysis of Risk Factors of Project Cost Base on the Monte-Carlo Simulation[J]. JOURNAL OF CIVIL AND ENVIRONMENTAL ENGINEERING,2005,27(6):121-126.10.11835/j. issn.1674-4764.2005.06.028

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:2005-06-24
  • 录用日期:
  • 在线发布日期:
  • 出版日期:
文章二维码