广州广清卫生河大桥施工监控中的应力监测
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

U448.35 U446.2

基金项目:


Stress Measuring during the Construction Monitoring of Weisheng River Bridge in Guangzhou
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    在对广清进出城卫生河大桥进行施工过程模拟计算的基础上,介绍了在施工监控过程中应力测量的布点情况、测试方法,以及实际应力的计算方法,实测结果与理论值符合较好。施工监控中的应力监测可为桥梁施工过程提供结构工作状况的参考和指导。

    Abstract:

    In this paper,the simulation calculation of Weisheng River Bridge was firstly conducted.Based on it,the measuring points and methods for stress measuring and calculation approach for real stress were introduced.The measured results matched the calculated results very well.Stress measuring during the construction monitoring can serve as references and guides of the structural situations during the different bridge construction process.

    参考文献
    相似文献
    引证文献
引用本文

李静 殷建军 王卫锋 贾鑫磊.广州广清卫生河大桥施工监控中的应力监测[J].土木与环境工程学报(中英文),2006,28(4):68-71. LI Jing, YIN Jian -jun, WANG Wei -feng, JIA Xin -lei. Stress Measuring during the Construction Monitoring of Weisheng River Bridge in Guangzhou[J]. JOURNAL OF CIVIL AND ENVIRONMENTAL ENGINEERING,2006,28(4):68-71.10.11835/j. issn.1674-4764.2006.04.017

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2006-12-20
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期:
  • 出版日期:
文章二维码