通口水电站冲沙底孔廊道压力和消能问题的试验
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

TV61

基金项目:


Study on the Sand Duct Pressure and Energy Dissipation for Tongkou Hydro Power Station
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    通口水电站是以发电为主,采用混合开发方式的综合性水利枢纽工程,坝高73.5 m。本文结合水工模型试验成果,论述了通口电站冲沙底孔的过流能力和流量系数,研究了冲沙底孔体型布置对廊道压力、消能防冲及电站尾水等的影响,提出了改善冲沙底孔廊道压力和改善消能防冲条件的工程措施,该研究成果已被设计采用。

    Abstract:

    Tongkou power station is an all-round hydro project,where the mixed exploitation mode is adopted with mainly for power generation.Integrated with the model test result,the duct discharge capacity and flow coefficient in various discharge hole are discussed,the influence of duct shape on inlet pressure,energy dissipation and tail water is analyzed,the improvement measures on conveyer way pressure and energy dissipation are put forward too.The achievements of this study have been adopted by the designers.

    参考文献
    相似文献
    引证文献
引用本文

张绪进 尹崇清 刘亚辉.通口水电站冲沙底孔廊道压力和消能问题的试验[J].土木与环境工程学报(中英文),2006,28(5):18-22. ZHANG Xu - jin, YIN Chong - qing, LIU Ya - hui. Study on the Sand Duct Pressure and Energy Dissipation for Tongkou Hydro Power Station[J]. JOURNAL OF CIVIL AND ENVIRONMENTAL ENGINEERING,2006,28(5):18-22.10.11835/j. issn.1674-4764.2006.05.004

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2006-05-15
  • 最后修改日期:2006-05-15
  • 录用日期:
  • 在线发布日期:
  • 出版日期:
文章二维码