重庆市人民大厦预应力转换梁施工关键技术
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

P315.97 TU37

基金项目:


Study on the Key Construction Techniques about the Prestressed Transform Beam of Chongqing People''''s Mansion
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    为保证大体积预应力混凝土转换梁的施工质量,防止和控制在张拉前出现裂缝,对混凝土的浇筑工艺、温度及裂缝控制方法作了认真分析研究,并进行了理论计算和施工过程温度监测,取得了较好的实际效果。文中还结合转换梁的预应力施工特点进行了介绍,最后给出了参考建议。

    Abstract:

    In order to ensure the construction quality of the massive prestressed transform beam, to prevent and control the cracking before tensioning ,the technology of casting ,methods of temperature and crack controlling are carefully analysed and theoretical calculation is carried out as well as the temperature inspection during construction ,all of which have effective results. Some prestressed construction points of transform beam are also introduced in this article, and reference advices are given at last.

    参考文献
    相似文献
    引证文献
引用本文

秦士洪 刘建明 刘大海 黄远峰 洪硕钊.重庆市人民大厦预应力转换梁施工关键技术[J].土木与环境工程学报(中英文),2007,29(4):60-65. QIN Shi-hong, LIU Jian-ming, LIU Da-hai, HUANG Yuan-feng, HONG Shuo-zhao. Study on the Key Construction Techniques about the Prestressed Transform Beam of Chongqing People''''s Mansion[J]. JOURNAL OF CIVIL AND ENVIRONMENTAL ENGINEERING,2007,29(4):60-65.10.11835/j. issn.1674-4764.2007.04.014

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:2007-02-28
  • 录用日期:
  • 在线发布日期:
  • 出版日期:
文章二维码