P642
中南电力设计院电顾科技[2006]64号项目
李珂,唐红梅,易丽云,陈洪凯.泥石流沟岸耦合三维数值仿真[J].土木与环境工程学报(中英文),2008,30(1):68-76. LI Ke, TANG Hong-mei, YI Li-yun, CHEN Hong-kai. Numerical Simulation on Coupling Problem between Debris Flow and Bank of Debris Flow Valley[J]. JOURNAL OF CIVIL AND ENVIRONMENTAL ENGINEERING,2008,30(1):68-76.10.11835/j. issn.1674-4764.2008.01.018
复制