地铁隧道开挖过程三维物理模型动态试验研究
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Real Simulation of 3D Physical Model Testing for Metro Station Tunnel Construction
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    据相似材料大比尺三维概念物理模型理论,高仿真度制作了成型盾构隧道地铁站厅隧道开挖试验物理模型。模拟了双盾构隧道之间开挖站厅隧道的全过程,研究了站厅隧道、横通道开挖过程中模型地表沉降,土体的变形,盾构隧道及站厅隧道洞周特征点的位移。模拟并研究了混凝土加固桩对土体位移的影响,总结出土体的动态力学特征和变形规律,得出一些有益的认识和结论。对指导地铁施工、研究在已建成双隧道间拓展开挖站厅空间具有十分重要的意义。

    Abstract:

    Based on the large scale conceptual model theory of similar material, a physical model of metro station tunnel excavation was simulated. The excavation process of metro station tunnel between existing double tubes also was simulated. Ground settling, soil deformation and displacement of specific points around tunnels were studied. The influence of a castinplace pile on reducing soil displacement was simulated. The dynamic mechanical behavior and deformation laws of the soil were obtained along with some useful conclusions. The conclusions are beneficial for guiding the construction and expanded excavation of metro station spaces between existing double tubes.

    参考文献
    相似文献
    引证文献
引用本文

王克忠.地铁隧道开挖过程三维物理模型动态试验研究[J].土木与环境工程学报(中英文),2008,30(5):42-46. WANG Kezhong. Real Simulation of 3D Physical Model Testing for Metro Station Tunnel Construction[J]. JOURNAL OF CIVIL AND ENVIRONMENTAL ENGINEERING,2008,30(5):42-46.10.11835/j. issn.1674-4764.2008.05.009

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期:
  • 出版日期:
文章二维码