矿井井塔的梁柱刚度比对剪力滞后效应的影响
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


The Influence of Beam Column Stiffness Ratio of Mine Shaft Tower to Shear Lag Effect
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    利用大型有限元分析软件ANSYS,结合井塔的实际框筒结构工程进行建模分析,通过矿井井塔在水平荷载作用下的具体性能表现,得出梁柱刚度比对剪力滞后效应有较大的影响。再对梁柱刚度比对剪力滞后效应的现象进行分析,将计算结果与仿真分析的结果进行比较,提出改进方法。

    Abstract:

    Making use of large finite element analysis software ANSYS, combine with the mine shaft tower actual frame tube structure project to model analysis, by means of concrete performance of mine shaft tower under the effect of horizontal load, come to a conclusion that beam column stiffness ratio has a great influence on shear lag effect. Then analyse the phenomenon of beam column stiffness ratio to shear lag effect, make a comparison on calculated results and simulation analysis results, to move an improved method. It has a great guiding significance for the mine shaft tower structural design.

    参考文献
    相似文献
    引证文献
引用本文

曹启坤,吴美璇.矿井井塔的梁柱刚度比对剪力滞后效应的影响[J].土木与环境工程学报(中英文),2012,34(Z1):46-48. CAO Qikun, WU Meixuan. The Influence of Beam Column Stiffness Ratio of Mine Shaft Tower to Shear Lag Effect[J]. JOURNAL OF CIVIL AND ENVIRONMENTAL ENGINEERING,2012,34(Z1):46-48.[doi]

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2012-09-13
  • 出版日期: