环向预应力FRP约束混凝土圆柱应力应变关系
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:

国家自然科学基金项目(50978021);同济大学土木工程防灾国家重点实验室开放基金项目(SLDRCE08-MB-01)


Stress-Strain Relationship of Circular Concrete Columns Confined with Lateral Pre-tensioned FRP
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    环向预应力FRP能够对核心混凝土提供主动约束,避免FRP的应力滞后问题,增强约束效果。在设计时若采用非预应力FRP约束混凝土的计算模型和应力应变关系模型,将会造成很大的误差。引入与环向预应力大小有关的初始约束应力和有效约束应力,并依据已有的试验数据和有限元模拟,提出了环向预应力FRP约束混凝土圆柱的峰值应力和峰值应变、极限应力和极限应变的计算模型;分析了环向预应力FRP约束混凝土圆柱的初始弹模,借鉴已有的FRP约束混凝土的应力应变关系模型,提出了环向预应力FRP约束混凝土圆柱的三线性应力应变关系模型,计算结果与试验结果吻合良好。

    Abstract:

    The active confinement for the core concrete can be provided by lateral pre-tensioned FRP, the stress hysteresis of FRP can be avoided, and good confinement effect for concrete columns can be got. It must cause large error if adopt the calculated model and constitute model of concrete columns confined with non-pretentioned FRP. The initial confined stress and effective confined stress associated with the lateral pre-stress were introduced. According to the test results and finite element simulation, the calculated model on peak stress, peak strain, ultimate stress and ultimate strain of circular concrete columns confined with lateral pre-tensioned FRP were proposed, and the initial elastic modulus of circular concrete columns confined with lateral pre-tensioned FRP was analyzed. Based the exiting stress-strain models of circular concrete columns confined with FRP, the three linear stress-strain model of circular concrete columns confined with lateral pre-tensioned FRP was recommended, and good agreement between theoretical and test results is achieved.

    参考文献
    相似文献
    引证文献
引用本文

周长东,白晓彬,吕西林,张艾荣.环向预应力FRP约束混凝土圆柱应力应变关系[J].土木与环境工程学报(中英文),2012,34(Z1):179-185. ZHOU Changdong, BAI Xiaobin, LYU Xilin, ZHANG Airong. Stress-Strain Relationship of Circular Concrete Columns Confined with Lateral Pre-tensioned FRP[J]. JOURNAL OF CIVIL AND ENVIRONMENTAL ENGINEERING,2012,34(Z1):179-185.[doi]

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2012-09-13
  • 出版日期:
文章二维码