    摘要:

    通过对等截面简支梁的分析,推导跨中挠度校验系数(ηy)与一阶竖弯频率校验系数(ηf)的关系;对某6梁式简支T梁桥的进行仿真分析,探讨在支座刚度变化、边界条件变异、桥面系参与受力以及承重构件损伤等各种情况下ηy和1/η2f的变化规律以及两者的差异。对两座装配式T梁桥进行静载试验以及动力特性测试,并分析各种试验工况下实测ηy以及1/η2f。仿真分析和实桥试验结果表明:1/η2f能代替ηy来反映简支梁桥整体刚度,快速评定其承载力。

    Abstract:

    The relation between the deflection check coefficient (ηy) of mid-span and first vertical flexural frequency check coefficient (ηf) was established based on theory of the uniform cross-section simple-supported beam. The variation and difference between the ηy and 1/η2f of a simple-supported six girder bridge were researched by simulation under these situations: change of the bearing stiffness; change of the boundary conditions; the floor system enhanced the structural stiffness; local damage of the superstructure. The static loading test and dynamic characteristic test of two fabricated simple-supported T girder bridges were taken to get the measured ηy and 1/η2f. Simulation and experimental results show that 1/η2f can instead ηy to reflect the structural stiffness of the simple-supported girder bridge and rapid assess its load-bearing capacity.

    参考文献
    相似文献
    引证文献
引用本文

李伟钊,王宗林,李荣达,李忠龙.简支梁桥承载力以动代静快速评估方法[J].土木与环境工程学报(中英文),2012,34(Z1):191-195. LI Weizhao, WANG Zonglin, LI Rongda, LI Zhonglong. Rapid Assessment of Load-Bearing Capacity About Simple-SupportedGirder Bridge Based on Dynamic Test instead of Static Loading Test[J]. JOURNAL OF CIVIL AND ENVIRONMENTAL ENGINEERING,2012,34(Z1):191-195.[doi]

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2012-09-13
  • 出版日期:
文章二维码