模糊综合评价模型在输变电工程项目后评价中的应用
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Application of Fuzzy Comprehensive Evaluation in Post-Evaluation of Power Transmission and Transformation Project
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    输变电工程的投资既具有盈利性目的,又具有社会公益性特性,做好输变电工程项目后评价可以为后续电网建设和运营提供指导和积累经验,提高电网建设项目的企业效益和社会效益。输变电工程项目后评价具有综合性、层次性和模糊性的特点,因而利用目前比较传统的评价方法对其进行评价存在一些不足之处。本文根据输变电工程项目后评价的特点,建立了输变电工程项目后评价指标体系,选取模糊层次综合评价方法,构建了输变电工程项目后评价的综合评价模型。并通过案例对输变电工程项目后评价的模型进行了具体分析和应用。实证表明,该模型能有效地评价输变电工程项目运营的效果。

    Abstract:

    Investment of power transmission and transformation project is of profits, as well as a kind of public service. Good post-evaluation of power transmission and transformation project can provide references for subsequent power grid construction, as well as improve enterprise benefits and social benefits. Post-evaluation of power transmission and transformation project is of characteristics of comprehensiveness, multi-layer and fuzziness. Based on its characteristics, this paper establishes the index system of post-evaluation. In evaluation methods,fuzzy hierarchy comprehensive evaluation is selected to build fuzzy comprehensive evaluation model of power transmission and transformation project, which is analyzed specifically by applying one case study. The results show that this model can effectively evaluate the economic benefits of the power transmission and transformation project.

    参考文献
    相似文献
    引证文献
引用本文

孙洪波,訾建章,杜代华,操晓岚,郑飞扬.模糊综合评价模型在输变电工程项目后评价中的应用[J].土木与环境工程学报(中英文),2013,35(Z2):101-103. Sun Hongbo, Zi Jianzhang, Du Daihua, Cao Xiaolan, Zheng Feiyang. Application of Fuzzy Comprehensive Evaluation in Post-Evaluation of Power Transmission and Transformation Project[J]. JOURNAL OF CIVIL AND ENVIRONMENTAL ENGINEERING,2013,35(Z2):101-103.[doi]

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2014-02-25
  • 出版日期:
文章二维码