    摘要:

    以深圳地铁车公庙交通枢纽7 & 9号线车站深基坑工程为研究背景,选取典型的监测断面,埋置混凝土应变计,进行地下连续墙的内力测试,分析了连续墙在深基坑开挖过程中的内力变化规律,并对连续墙的安全性进行了评价,得到以下结论:随着基坑开挖深度的增加,地下连续墙的内力变化越发明显,基坑负二层和负三层开挖对连续墙的内力变化影响较大,应重点关注和监测;根据现场测试数据得到两侧地下连续墙的内力变化并非完全一致,主要受到紧邻基坑开挖和周边建筑物的影响;最后计算得到地下连续墙处于安全状态。

    Abstract:

    A typical measurement-section was selected, and concrete strain meters were embedded to make measurement for diaphragm walls on the construction of Station of Metro Line 7&9 of Chegongmiao Station of Shenzhen Metro. The internal force change of diaphragm walls was discussed, and the reliability of diaphragm walls was evaluated. Results showed that with the increasing of the excavation depth of foundation pits, the variation of stresses of diaphragm walls was observable. According to the strain data from field measurement, safety factors of diaphragm walls were calculated, which turned out to meet national code. Meanwhile, it can be concluded that diaphragm walls were in the safe status. In the end, the variation relationship of their internal force, which would provide some references for the design and construction of similar projects in the future, was obtained.

    参考文献
    [1] EMILIOS M C,MELLO C P,GEORGIOS K K.Effects from diaphragm wall installation to surrounding soil and adjacent buildings[J]. Computers and Geotechnics, 2013, 53:106-121.
    [2] GOH-ANTHONY T C,XUAN F,ZHANG W G. Reliability assessment of diaphragm wall deflections in soft clays[J]. Foundation Engineering in the Face of Uncertainty, 2013, 487-496.
    [3] WYJADLOWSKI M,PULA W,BAUER J. Reliability of diaphragm wall in serviceability limit states[J]. Archives of Civil and Mechanical Engineering, 2015,288:1-9.
    [4] 石钰锋,阳军生,白伟,等.紧邻铁路偏压基坑围护结构变形与内力测试分析[J].岩石力学与工程学报,2011,30(4):826-833. SHI Y F,YANG J S,BAI W,et al.Analysis of field measurementing for deformation and internal force of unsymmetrical loaded foundation pit's enclosure structure close to railway[J].Chinese Journal of Geotechnical Engineering, 2011, 30(4):826-833. (in Chinese)
    [5] 王树英,阳军生,唐鹏,等.八车道明挖湖底隧道结构受力现场测试与安全性评价[J].土木工程学报,2014,47(11):120-127. WANG S Y,YANG J S,TANG P, et al. Field measurement of stresses and safety evaluation of eight-lane framed lake tunnel with the cut-and-cover method[J]. China Civil Engineering Journal, 2014, 47(11):120-127. (in Chinese)
    [6] YASUSHI A,OSAMU K,OSAMU M, et al. A numerical study on ground displacement and stress during and after the installation of deep circular diaphragm walls and soil excavation[J]. Computers and Geotechnics, 2008, 35:791-807.
    [7] PAOLO F,FRANCESCO C. Seismic performance-based design of flexible earth-retaining diaphragm walls[J].Engineering Structures, 2014, 78:57-68.
    [8] CHU E H, SC D, HU S. Design optimization of underground metro station diaphragm walls using numerical modeling[C]//Geo-Congress 2014 Technical Papers,ASCE, 2014:439-470.
    [9] NICOLETA M I,FARCAS V S,POP M.Design optimization of diaphragm walls[J]. Procedia Technology, 2015, 19:357-362.
    [10] LUIS S C,ANTONIO A, ALEJANDRO J. Bi-layer diaphragm walls:Experimental and numerical structural analysis[J]. Engineering Structures, 2013, 56:154-164.
    [11] LUIS S C, ALEJANDRO J, ANTONIO A. Bi-layer diaphragm walls:Parametric study of construction processes[J]. Engineering Structures, 2014, 59:608-618.
    [12] TAN Y, WEI B. Observed behaviors of a long and deep excavation constructed by cut-and-cover technique in Shanghai soft clay[J]. Journal of Geotechnical and Geoenvironmental Engineering, 2012, 138:69-88.
    [13] 中铁二院工程集团有限责任公司. 深圳地铁车公庙综合交通枢纽工程施工图设计[R]. 成都:中铁二院工程集团有限责任公司, 2012. China Railway Eryuan Survey and Design Group Co., Ltd. Design blueprint of Chegongmiao comprehensive transportation hub project of Shenzhen metro[R]. Chengdu:China Railway Eryuan Survey and Design Group Co., Ltd., 2012. (in Chinese)
    [14] 中华人民共和国国家标准编写组.混凝土结构设计规范:GB 50010-2010[S].北京:中国建筑工业出版社, 2010. The National Standards Compilation Group of People's Republic of China. Code for design of concrete structures:GB50010-2010[S]. Beijing:China Architecture and Building Press, 2010. (in Chinese)
    [15] 中华人民共和国住房和城乡建设部.建筑基坑支护技术规程:JGJ 120-2012[S]. 北京:中国建筑工业出版社, 2012. Ministry of Housing and Urban-Rural Development of the People's Republic of China. Technical specification for retaining and protection of building foundation excavations:JGJ 120-2012[S]. Beijing:China Architecture and Building Press, 2012. (in Chinese)
    引证文献
    网友评论
    网友评论
    分享到微博
    发 布
引用本文

陈江,阳军生,陈思明,张学民,欧雪峰.紧邻立交桥的连续墙受力分析和安全性评价[J].土木与环境工程学报(中英文),2016,38(3):12-17. Chen Jiang, Yang Junsheng, Chen Siming, Zhang Xuemin, Ou Xuefeng. Force analysis and security assessment of diaphragm walls adjacent overpasses[J]. JOURNAL OF CIVIL AND ENVIRONMENTAL ENGINEERING,2016,38(3):12-17.10.11835/j. issn.1674-4764.2016.03.002

复制
分享
文章指标
  • 点击次数:1067
  • 下载次数: 1000
  • HTML阅读次数: 459
  • 引用次数: 0
历史
  • 收稿日期:2016-03-03
  • 在线发布日期: 2016-06-27
文章二维码