U213.1;TU413.5
铁道部科技研究开发计划项目(2012G009-C);国家自然科学基金(51078358);高铁联合基金(U1134207)
王敏,李义杰,徐林荣.高铁路基动载沉降现场监测分析[J].土木与环境工程学报(中英文),2017,39(6):22-29. Wang Min, Li Yijie, Xu Linrong. Field monitoring and analysis of dynamic load settlement of high speed railway subgrade[J]. JOURNAL OF CIVIL AND ENVIRONMENTAL ENGINEERING,2017,39(6):22-29.10.11835/j. issn.1674-4764.2017.06.003
复制