铁路路堑高边坡的长期稳定评价方法及分级预警方法
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

U211.2

基金项目:

国家自然科学基金(52078086、51778092);国家重点研发计划(2019YFC1509605)


Long-term stability and hierarchical early warning scheme for high slope of railway cutting
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    在铁路建设与运维中,由于工程地质条件、自然及施工环境条件等因素影响,路堑高边坡安全一直是铁路工程重点关注的问题。针对铁路路堑高边坡的长期稳定性问题,详细分析了边坡的安全系数与变形关系、岩土体的长期强度与时间关系,建立了边坡安全系数剪切变形时间关系模型,提出长期稳定安全系数、变形速率幂次值、位限指数等3个路堑高边坡长期稳定性评价指标,以及高边坡安全稳定四级预警方法与高边坡安全稳定八级预警方法,并明确了不同预警等级下建议采取的应急处理措施。通过实际工程监测数据对铁路路堑高边坡瞬时稳定安全系数、长期稳定安全系数、长期累积变形状态进行系统分析,确定了该路堑高边坡的风险预警分级。

    Abstract:

    In railway construction, operation and maintenance, due to the influence of engineering geological factors, natural and construction activities and other factors, the safety of high cutting slope is one of the main key concerns of railway engineering. For the long-term stability of railway roadbed slope,based on the slope safety factor and deformation relationship, long-term strength of rock and soil, and tempo relationship, this paper established the safety factor of slope, shear deformation and time relation model, proposed three cut high slope stability evaluation index, including the long-term stability safety coefficient, the exponential value of deformation rate and the index of limit,and four-level and eight-level early warning schemes for high slope safety and stability,specified the emergency treatment measures which should be taken under different early warning levels.Through the actual engineering monitoring data, the instantaneous stability safety factor, long-term stability safety factor and long-term cumulative deformation state of high railway cut slope were systematically analyzed, and the risk warning classification of the high cut slope was determined.

    参考文献
    相似文献
    引证文献
引用本文

杨甲锋,肖鹏.铁路路堑高边坡的长期稳定评价方法及分级预警方法[J].土木与环境工程学报(中英文),2022,44(5):67-77. YANG Jiafeng, XIAO Peng. Long-term stability and hierarchical early warning scheme for high slope of railway cutting[J]. JOURNAL OF CIVIL AND ENVIRONMENTAL ENGINEERING,2022,44(5):67-77.10.11835/j. issn.2096-6717.2021.156

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2021-06-14
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2022-06-28
  • 出版日期: