装配式混凝土U型钢筋环扣的连接长度
CSTR:
作者:
作者单位:

1.桂林理工大学,广西 桂林 541000;2.贺州学院,广西 贺州 542800;3.华东建筑设计研究有限公司,上海 200001;4.贺州通号装配式建筑有限公司,广西 贺州 542800;5.中建五局山东公司,济南 250000

作者简介:

陈宜虎(1979- ),男,博士,教授,主要从事装配式建筑研究,E-mail:yihu.chen@outlook.com。
CHEN Yihu (1979- ), PhD, professor, main research interest: prefabricated concrete structure, E-mail: yihu.chen@outlook.com.

通讯作者:

张敏(通信作者),男,博士,教授,E-mail:emailzm@126.com。

中图分类号:

TU375.4

基金项目:

国家重点研发计划(2016YFC0701902-4);广西自然科学基金(2018GXNSFAA050145);贺州市新驱动发展专项(贺科创ZX1907002, PT1907009)


Lap splice length of U-shaped rebar loop in precast concrete structure
Author:
Affiliation:

1.Guilin University of Technology, Guilin 541000, Guangxi, P. R. China;2.Hezhou University, Hezhou 542800, Guangxi, P. R. China;3.East China Architectural Design & Research Institute Co., Ltd, Shanghai 200041, P. R. China;4.Hezhou Tonghao Prefabricated Construction Co., Ltd., Hezhou 542800, Guangxi, P. R. China;5.China Construction Fifth Engineering Bureau Co., Ltd. Shandong Branch, Jinan 250000, P. R. China

Fund Project:

National Key Research and Development Program of China (No. 2016YFC0701902-4); Natural Science Foundation of Guangxi (No. 2018GXNSFAA050145); New Drive Development Project of Hezhou (No. ZX1907002, PT1907009)

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    为研究装配式混凝土U型钢筋环扣连接的搭接长度,制作了1个现浇梁柱节点试件和3个不同搭接长度的U型钢筋环扣连接节点对比试件,进行低周反复拟静力试验,观察各试件的破坏模式,研究其滞回性能、承载力、变形能力及钢筋的应力发展过程,分析装配式混凝土U型钢筋环扣连接的合理搭接长度。结果表明:装配式节点试件承载力高于现浇节点试件;不同搭接长度试件的延性及耗能能力有所不同,搭接长度的增长有利于试件承载力、延性和耗能能力等抗震性能的提升;基于试验结果,拟合回归了U型钢筋环扣连接的合理搭接长度,对装配式混凝土U型钢筋环扣连接节点的优化设计提出了建议。

    Abstract:

    To study the lap splice length of U-shaped rebar loop in precast concrete structure, three fabricated specimens with different lap splice length and one cast-in-place beam-column joint comparison specimen were carried out for low-cycle repeated quasi-static tests. By observing the failure modes of each specimen, the corresponding hysteretic behavior, bearing capacity, deformation capacity, and the stress development process of reinforcement were studied, and then the reasonable lap splice length of U-shaped rebar loop in precast concrete structure was analyzed. The results show, (1) the bearing capacity of fabricated joints is higher than that of cast-in-place joints; (2) the ductility and energy dissipation capacity of specimens with different lap splice length are different; (3) the increase of lap splice length is conducive to the improvement of the bearing capacity, ductility, and energy dissipation capacity of specimens. Finally, based on the test results, the reasonable lap splice length of U-shaped rebar loop is fitted and regressed, and then the suggestions for the optimal design of the joint of the lap splice length of U-shaped rebar loop in precast concrete structure are putting forward.

    参考文献
    相似文献
    引证文献
引用本文

陈宜虎,陆鹏远,张敏,卢旦,刘丰收,秦稳.装配式混凝土U型钢筋环扣的连接长度[J].土木与环境工程学报(中英文),2023,45(2):131-140. CHEN Yihu, LU Pengyuan, ZHANG Min, LU Dan, LIU Fengshou, QIN Wen. Lap splice length of U-shaped rebar loop in precast concrete structure[J]. JOURNAL OF CIVIL AND ENVIRONMENTAL ENGINEERING,2023,45(2):131-140.10.11835/j. issn.2096-6717.2021.129