高速公路低路堤服役状态风险评估
DOI:
作者:
作者单位:

中南大学

作者简介:

通讯作者:

中图分类号:

基金项目:

国家自然科学基金项目(面上项目,重点项目,重大项目)


Risk assessment of expressway low-embankment-subgrade in service status
Author:
Affiliation:

Central South University

Fund Project:

The National Natural Science Foundation of China (General Program, Key Program, Major Research Plan)

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    高速公路低路堤受到路基高度的限制,容易产生工后沉降过大或不均匀沉降等问题。目前,路基设计和养护规范均未针对低路堤设计进行统一规定,导致低路堤在建设期和运营期存在诸多影响工程正常使用的问题。本文借鉴地质灾害风险评估理论,分析干湿循环、交通荷载等影响因素,并考虑养护维修而对各因素进行修正,提出了低路堤路基服役状态评估方法。该方法运用模糊综合评价法和物元分析方法分析建设期结构质量易损性和运营期路基危险性及养护维修修正值,得出低路堤路基综合风险度。将该方法运用于浙北低路堤段工程实例,得综合风险度为低度,服役状态风险程度与现场调查结果基本一致,说明了该评估方法的可行性。

    Abstract:

    The low embankment of the expressway is limited by the height of the subgrade, which easily causes problems such as excessive settlement or uneven settlement after construction. At present, the subgrade design and maintenance codes did not uniformly regulate the design of the low embankment, resulting in many problems that would affect the normal use of the project during the construction and operation of the low embankment. Based on the risk assessment theory of geological disaster, this paper analyzed some factors such as drying and wetting cycle and traffic load. In addition, considering the maintenance and repair, these factors were modified and the evaluation method of low-embankment-subgrade in service status was proposed. The method used fuzzy comprehensive evaluation method and matter-element analysis method to analyze the structural quality vulnerability in construction period, the risk of subgrade in operation period and the modified value of maintenance and repair. Finally, it obtained the comprehensive risk of low-embankment-subgrade. The method was applied to the project example of the low embankment in northern Zhejiang. The result shows that the comprehensive risk is low and the service state risk is basically consistent with the filed survey result, which illustrate the feasibility of the evaluation method.