江阴长江大桥B标工程施工总结
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

U445.1

基金项目:


Construction Technology for Bid Construction Part B of Yangtze River Bridge in Jiangyin City
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    详细介绍了中国第一跨度的江阴长江大桥B标施工中采用的先进施工工艺和管理措施,如索塔施工三维坐标法测量,人工小药量挖孔桩,下塔柱翻横施工,大体积混凝土浇注温度控制,塔柱斜爬模施工等,可供大型桥梁施工时参考。

    Abstract:

    In this paper, the advanced construction technology and site management applied in bid construction part B of Yangtze River bridge in Jiangyin was presented in detail. This bridge is the largest span bridge in China, where the advanced technology applied is: 3-d coordinate control surveying in bridge tower, small powder for artificial pile, over-form and climb form in construction of tower column, temperature control for casting mass concrete. It is of great value for reference to large bridge building.

    参考文献
    相似文献
    引证文献
引用本文

董荧.江阴长江大桥B标工程施工总结[J].土木与环境工程学报(中英文),2001,23(5):85-90129. DONG Ying. Construction Technology for Bid Construction Part B of Yangtze River Bridge in Jiangyin City[J]. JOURNAL OF CIVIL AND ENVIRONMENTAL ENGINEERING,2001,23(5):85-90129.10.11835/j. issn.1674-4764.2001.05.018

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期:
  • 出版日期: