监理工程师如何在项目实施阶段控制工程造价
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

TU723.3

基金项目:


A Discussion on How to Control Project Cost during Construction Stage
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    就现行建筑市场中,监理工程师在实施阶段才介入项目管理的情况下如何有效进行造价控制进行了探讨。并以某项目为例指出监理工程师在造价控制工作中应该注意的问题。即:必须要具备丰富的工程经验,相应的造价知识和合同管理能力,从标书评价中工程量清单单价分析和合理签订合同入手;在施工过程中把好现场稚订关,善于识别承包商的索赔技巧,注意结算阶段的费用控制,才能在项目实施阶段对造价控制有所作为。

    Abstract:

    In this paper, how to effectively control building cost under the current situation is discussed, due to that the engineers take part into project management only in the stage of construction. It points out that the engineers should notice the following issues when applying cost control: they should be experienced with necessary knowledge on building cost and contracts control, analyze each cost in bills of project volume carefully, sign a set of reasonable contracts, pay attention to the site sign, understand their skills of claim for compensation and pay much attention to cost control during settlement stage.

    参考文献
    相似文献
    引证文献
引用本文

吴刚 焦斌权.监理工程师如何在项目实施阶段控制工程造价[J].土木与环境工程学报(中英文),2002,24(4):101-104. WU Gang, JIAO Bin-quan . A Discussion on How to Control Project Cost during Construction Stage[J]. JOURNAL OF CIVIL AND ENVIRONMENTAL ENGINEERING,2002,24(4):101-104.10.11835/j. issn.1674-4764.2002.04.023

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:2002-04-09
  • 录用日期:
  • 在线发布日期:
  • 出版日期: