高位水箱供水系统水压问题的探讨
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

TU821.1

基金项目:


Investigation on the Pressure Head of Water Supply System with Head Tank
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    水泵-高位水箱联事供水的生活给水系统是广泛应用于高层建筑的成熟技术,近年来,随着新型给水管材的应用和装修的兴起,常出现高层住宅最高几层用水水压严重不足的问题,结合工程实践对这一问题出现的原因和解决的方法进行了初步探讨,提出了参考意见。

    Abstract:

    The water supply system with pump-head tank joint water supply is a mature technology widely used in high-rise buildings. In recent years, with widespread of new type pipe material and decoration of buildings, there is insufficient pressure head of water supplied at top floors in high-rise buildings. In this paper from the experience in engineering practice the reason for this problem and its countermeasures are investigated, then some suggestions are given.

    参考文献
    相似文献
    引证文献
引用本文

林玲.高位水箱供水系统水压问题的探讨[J].土木与环境工程学报(中英文),2004,26(5):73-76. LIN Ling. Investigation on the Pressure Head of Water Supply System with Head Tank[J]. JOURNAL OF CIVIL AND ENVIRONMENTAL ENGINEERING,2004,26(5):73-76.10.11835/j. issn.1674-4764.2004.05.016

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:2004-01-09
  • 录用日期:
  • 在线发布日期:
  • 出版日期: