南京长江4桥北锚碇沉井的排水下沉分析
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Dewater Sinking Analysis of North Anchorage Caisson for the Fourth Nanjing Yangtze River Bridge
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    结合南京长江4桥北锚碇沉井的施工特点,在现场抽水试验基础上,综合确定了沉井排水下沉期间的渗透系数,由此理论计算单井出水量、总涌水量等并进行排水设计,实际涌水量略大于理论值;根据有效应力原理,认为沉井降水对潜水含水层的影响很小,沉降主要由承压水含水层压缩引起,由此得到的沉降曲线与实测结果总体吻合较好。

    Abstract:

    Combined with construction of north anchorage caisson, field pumping tests were carried out. Permeability coefficient was acquired for dewater sinking. Water yield of single well and total water inflow of caisson excavation were calculated. It is found that the measured amount of total water inflow is slightly larger than the theoretical value. Based on effective stress principle, the compression of phreatic water aquifer caused by dewater is almost negligible,and the ground settlement is mainly composed of confined water aquifer compression. The calculated settlement curve along the levee was in good agreement with the measured data.

    参考文献
    相似文献
    引证文献
引用本文

穆保岗,朱建民,龚维明,牛亚洲.南京长江4桥北锚碇沉井的排水下沉分析[J].土木与环境工程学报(中英文),2010,32(5):135-141. MU Bao gang, ZHU Jian min, GONG Wei ming, NIU Ya zhou. Dewater Sinking Analysis of North Anchorage Caisson for the Fourth Nanjing Yangtze River Bridge[J]. JOURNAL OF CIVIL AND ENVIRONMENTAL ENGINEERING,2010,32(5):135-141.10.11835/j. issn.1674-4764.2010.05.025

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2010-03-15
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期:
  • 出版日期: