Abstract:Combined with thedesign precept of Cai-Yuan highway tunnel 2 in Chongqing,stress state,time ffectiveness and rupture mechanism of rock near the bounda-ries of the tunnel and the second lining in jointed rock mass arc studied with model tests.The results show that shotcretc-bolt support betters mechanical properties of the periphey rock of the tunnel,and increases the capacity of anti-deformation.The second lining also has the action of supporting structure.