OPTIMAL SBLECTION OF CONSTRUCTION SCHEME OF THE MAIN BUILDING IN HIGY-RISE REINFORCED CONCRETE SHEAR-WALL STRUCTURE
Author:
Affiliation:

Clc Number:

TU974

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Relying on the mathematical model of fuzzy comprehensive estimation of con-struction sclieme optmization,comprehensive evaluation coefficient of every scheme can be figuredout with the auther's computer program in order to get optimal solution. This paper presents themethod of doing reliability analysis to optimal solution.

    Reference
    Related
    Cited by
Get Citation

姚刚.钢筋混凝土高层剪力墙主体结构施工方案的优选[J].土木与环境工程学报(中英文),1995,17(2):31~40

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online:
  • Published:
Article QR Code