A Practicable Engineering Algorithm ofParallel Machining System
CSTR:
Author:
Affiliation:

Clc Number:

TU712.1 TB11

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Parallel machining system is a kind of typical production environment.Its scheduling algorithm has Np_Completeness if E/T is optimal criterion.In this paper,an advanced heuristic algorithm is developed.The new algorithm's property lies in simplified computation,low complexity and easy programming.It has been shown that the heuristicalgorithm can be used in engineering.

    Reference
    Related
    Cited by
Get Citation

晏平 周焯结.并行E/T的一个工程算法[J].土木与环境工程学报(中英文),1998,20(2):47~51

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online:
  • Published:
Article QR Code