Abstract:Based on experimental study of 2 reinforced concrete columns with consolidated reinforced cover under cyclic loading action,this paper describes the influence of initial stress state and construction measure at binding surface on loading capacity of the column and puts forward a few consturction measures to ensure integral operation of both old and new parts.