How to Select a Known ProbabilityDistribution for an Element Cost
CSTR:
Author:
Affiliation:

Clc Number:

F282 TP317

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Various cost simulation software packages are extensively used in the construction industry today. There are some differences in the problems to which they are applied,but it is essential that users select suitable known distributions and estimate the parameter values for cost elements before starting any simulation. The accuracy and reliability of the simulation results depend on such selections. This paper proposes a practical and accurate selection method based upon the least differences of expected values and standard deviations between a known distribution and an estimated cost probability histogram.

    Reference
    Related
    Cited by
Get Citation

任宏 向小林.如何给某个成本要素选择一个已知的概率分布函数[J].土木与环境工程学报(中英文),1999,21(3):9~14

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online:
  • Published:
Article QR Code