Study on the Sequence of Parts with Constrains of Earliness and Tardiness in Job-Shop
CSTR:
Author:
Affiliation:

Clc Number:

O221 TH165

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The Earliness/Tardiness problem in job_shop is discussed in this paper.Based on the analysis of practical situations and lot transfer between stages,an integer programming mode is proposed,The solution is obtained by the application of Lagrangian relaxation technique.