A Study on the Method of Time-Resource Optimization of Engineering Projects
CSTR:
Author:
Affiliation:

Clc Number:

F284

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    This paper investigates the coordinated operation of the progress planning with the resource planning when carrying out engineering projects and puts forward a method of "RSM" under the resource limit conditions. Then, the "RSM" was improved to avoid complicated calculation. This method not only reduces the calculating work by hand but saves computer's memory as well, making the time-resource optimization work more quick and convenient.

    Reference
    Related
    Cited by
Get Citation

曹小琳,汪金根.工程项目工期——资源优化方法研究[J].土木与环境工程学报(中英文),2000,22(2):49~53