On Decisive Role of Force Majeure Term on Claim Indemnity
Author:
Affiliation:

Clc Number:

TU723.1

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Through the example of undertaking contracted projects abroad, this paper inquires into the decisive role of force majeure terms performance for later claim indemnity and opposite claim indemnity in engineering.

    Reference
    Related
    Cited by
Get Citation

王英.论不可抗力条款在索赔中的决定性作用[J].土木与环境工程学报(中英文),2000,22(2):78~80

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online:
  • Published:
Article QR Code