The Construction Proposals and Construction Technology of Steel Plate Pile Cofferdam of Off-shore Pumping House for the Highest Foundation in Asia
DOI:
Author:
Affiliation:

Clc Number:

TU721 TU753.62

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    This paper described in detail the construction proposals and construction technology of steel plate pile cofferdam used for the construction of off-shore pumping house of the highest foundation in Asia, as well as the construction method and technical analysis of treatment of 'exposed foot' of steel plate pile cofferdam.

    Reference
    Related
    Cited by
Get Citation

庞启彪.江水泵房施工组织设计及钢板桩围堰施工技术[J].土木与环境工程学报(中英文),2000,22(4):108~112

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online:
  • Published:
Article QR Code