Abstract:Around the reconstruction design of the Popular Science Image Building of the Southwest Hospital, the advantage of prestressed concrete frame used in the rebuilding was approved. At the same time, the problem in the prestressed frame design was pointed out. In the end, the method to decrease the moment in the column had been put forward.