Abstract:This paper presents an all-side study on one successful engineering project, the Chongqing Zhourong Plaza, twenty floors high with two air raids caves just cross under it. The study includes geological investigation, rock mass parameters choice, elastic-plastic rock mass failure criteria, calculation with finite element method, results analyses, conclusions on stability analyses and construction suggestions.