Methods of Determining and Deleting Additional Dummy Arrows in Network Diagram
CSTR:
Author:
Affiliation:

Clc Number:

TU721.3

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Based on analysis of the function of dummy arrow in network diagram, this paper provides some methods to determine and delete additional arrows. It will be helpful to personnel in engineering network planning for determining and deleting the additional dummy arrows quickly and correctly.

    Reference
    Related
    Cited by
Get Citation

罗明.论工程网络图中多余虚箭线的判定及去除方法[J].土木与环境工程学报(中英文),2001,23(2):51~55

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:July 05,2000
  • Adopted:
  • Online:
  • Published:
Article QR Code