Prefabricated Building Construction-The Use of Aluminium Alloy Formwork
Author:
Affiliation:

Clc Number:

TU755.21

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The Wah Wui System Formwork is a newly developed system formwork for industrialised housing in Hong Kong.The aluminium alloy formwork has lots of advantages,and the adoption of it can ensure the quality of concrete and therefore enhance the quality of housing. In this dissertation,the author introduces the design,materials of aluminium alloy formwork,and also the transportation,storage,installation,advantages and disadvantages of it.

    Reference
    Related
    Cited by
Get Citation

苏汝培.预制建筑施工工艺与铝合金板木的运用[J].土木与环境工程学报(中英文),2001,23(3):94~98

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:March 01,2001
  • Adopted:
  • Online:
  • Published:
Article QR Code