Study on the Ship Navigation Process after Construction of the Yangtze River Bridge in Sutong City
CSTR:
Author:
Affiliation:

Clc Number:

U442.54

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In this paper, the equations of ship and current motion model are established. The calculation of the ship manipulative capability parameter is consistent with the measured in static stream. Through the ship motion model, the layout of the navigation route and the change of the ship manipulative capability parameter due to the Yangtze River Bridge in Sutong City are studied.

    Reference
    Related
    Cited by
Get Citation

陈明栋 杨胜发 等.苏通长江大桥建桥后航线规划研究[J].土木与环境工程学报(中英文),2001,23(5):45~49

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:August 30,2001
  • Adopted:
  • Online:
  • Published:
Article QR Code