Abstract:The Citong Bridge is located in the river estuary section with 4 meter tide range and mixed geological structure. In this paper, the technique for construction of the main bridge pier was presented in detail, which consists of the construction process, technological requirements, main construction parameters and amendment on defects. It is of great value for reference to the similar works.