Construction Technology for Bid Construction Part B of Yangtze River Bridge in Jiangyin City
Author:
Affiliation:

Clc Number:

U445.1

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In this paper, the advanced construction technology and site management applied in bid construction part B of Yangtze River bridge in Jiangyin was presented in detail. This bridge is the largest span bridge in China, where the advanced technology applied is: 3-d coordinate control surveying in bridge tower, small powder for artificial pile, over-form and climb form in construction of tower column, temperature control for casting mass concrete. It is of great value for reference to large bridge building.

    Reference
    Related
    Cited by
Get Citation

董荧.江阴长江大桥B标工程施工总结[J].土木与环境工程学报(中英文),2001,23(5):85~90129

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online:
  • Published:
Article QR Code