Approach to Effective Control on the Project Investment
CSTR:
Author:
Affiliation:

Clc Number:

F282

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In this paper, in allusion to the three kinds of serious overvaluation (the budgetary estimate of project construction exceeds the rough estimate, the budget exceeds the budgetary estimate and the final accounts exceed the budget) causing uncontrollable project investment often appeared in domestic project construction,the main causes for that are analyzed. That is, the frequent project change and the malpractice of the cost managing system. In this paper, according to some real projects,the kinds and causes of project change are clarified and the malpractice of the cost managing system is analyzed. The effective approaches of reducing the project change, especially the united surveying and improving the cost managing system in order to make the effective control of the project investment are realized.

    Reference
    Related
    Cited by
Get Citation

郑应亨 吴德夫.探析项目投资有效控制的途径[J].土木与环境工程学报(中英文),2002,24(3):65~

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online:
  • Published:
Article QR Code