Economical Analysis of Project Schedule Controlling Objective
Author:
Affiliation:

Clc Number:

F284 TU722

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Reference
    Related
    Cited by
Get Citation

杨义兵 曹小琳.工程项目进度控制目标的经济性分析[J].土木与环境工程学报(中英文),2003,25(2):102~105

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:January 16,2003
  • Adopted:
  • Online:
  • Published:
Article QR Code