    As the project volume increases, the risk will increase correspondingly. In order to finish the project successfully, usually, the client would ask the contractor to submit a performance security sum. However, its meaning and form are not very clear and there is a lot of abnormal operation in China. Many dissensions have been arisen, which make the project performance difficult. Starting with a case study combined with international convention, the meaning and form of the performance security sum are explained in detail and the performance bond is introduced as a main point. At the same time, aiming at the actual situation in China some instructive advice according to international experience is put forward.

    Reference
    Related
    Cited by
Get Citation

单健.履约保证金应向谁提交[J].土木与环境工程学报(中英文),2003,25(4):91~94

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:April 02,2003
  • Adopted:
  • Online:
  • Published:
Article QR Code