On the Non-price Bottom Bidding System under the Mode of Valuation with Bill Quality of Construction Works
CSTR:
Author:
Affiliation:

Clc Number:

TU723.2

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    It is the direction of the project bidding system reform to apply the non-price bottom bidding system under the mode of valuation with bill quality of construction works in China. In this paper, the significance of implementing the non-price bottom bidding system is analyzed and emphasis is put on the workout of the non-price bottom bidding, valuation and so on. The risk prevention and risk management are studied on the side of tenderee from the qualification examination, engineering guarantee, defending system and so on.

    Reference
    Related
    Cited by
Get Citation

陈国龙,顾红春,张友志.工程量清单计价模式下的无标底招标研究[J].土木与环境工程学报(中英文),2004,26(2):116~120

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:December 09,2003
  • Adopted:
  • Online:
  • Published:
Article QR Code