Estimation of Earth Work Volume and Design Elevation in Large Earth Work
CSTR:
Author:
Affiliation:

Clc Number:

TU751

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In this paper,the approximation calculation method based on calculation model of earthwork formula of tetragonal prism is described. The optimization design elevation in large earthwork can be determined by this method. Through introducing a set of different design elevations, the difference between and sum of the total excavation and the total fill can be calculated. An economical analysis is carried out on the design elevation chosen with little value for both cases by numerical values comparison. The elevation with the lowest cost is taken as the optimal design elevation.

    Reference
    Related
    Cited by
Get Citation

方俊.大型场地平整土方量计算及其设计标高估算[J].土木与环境工程学报(中英文),2004,26(5):101~104

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:May 20,2004
  • Adopted:
  • Online:
  • Published:
Article QR Code