Abstract:On the basis of investigation on seepage in the Jinyunshan Tunnel and the Songjiagou No.1 Tunnel,the reasons of the seepage were analyzed and the cracking in concrete that led to seepage was studied by using the probability fracture mechanics.Finally,some suggestions of tunnel waterproofing were proposed.